Date |
From |
To |
Subject |
07/01/10 |
EPA (P. Silva) |
Kennecott (J. Cherry) |
Letter: Re-designed Treated Water Infiltration System Does Not Require a UIC Permit (PDF)
(1 p, 292K) |
04/06/10 |
Keweenaw (W. Emery) |
EPA (B. Mathur) |
Letter: Tribe Comments on Kennecott's Withdrawal of UIC Permit Application (PDF)
(6 pp, 1.7M) |
03/25/10 |
Kennecott (V. Peacey) |
EPA (R. Harvey) |
Document: Proposed Modification to Design Basis (PDF)
(7 pp, 319K) |
03/24/10 |
Kennecott (V. Peacey) |
EPA (R. Harvey) |
Letter: Withdrawal of Underground Injection Control (UIC) Permit Application (PDF)
(2 pp, 395K) |
03/19/10 |
Kennecott (V. Peacey) |
EPA (R. Harvey) |
Letter: Response to Inventory Request, Delivery of Dry Solids through Drilled Boreholes (PDF)
(6 pp, 1.15M)
Attachment 1:
Underground CRF Plant Layout 3D Views (PDF) (1 p, 341K)
Underground CRF Plant Plan & Elevations (PDF) (1 p, 425K)
Surface Plant Site Layout (PDF) (1 p, 625K)
Surface Plant Plan & Elevations (PDF) (1 p, 326K)
Attachment 2:
Lafarge Trinity White Portland Cement Product Data Sheet (PDF) (2 pp, 147K)
Lafarge Trinity White Portland Cement Material Safety Data Sheet (PDF) (6 pp, 109K) |
03/2010 |
The Cadmus Group |
EPA (J. McDonald) |
Analysis & Report (Prepared for EPA): Sections 2 and 3 of Tribe's Comments - Final (PDF)
(41 pp, 1.9M) |
02/24/10 |
Kennecott (V. Peacey) |
EPA (R. Harvey) |
Letter: Transmittal of Treated Water Infiltration System (TWIS) Redesign (PDF)
(22 pp, 2.2M) |
12/18/09 |
Kennecott (V. Peacey) |
EPA (R. Harvey) |
Letter: Response to Memorandum Dated 09/04/2009 from Ann Maest
(Stratus Consulting, Inc.) and Robert Prucha (Integrated Hydro Systems) (PDF)
(15 pp, 97K)
The CD which accompanied this letter contains the 178-page Proposal for Decision
by Judge Richard A. Patterson in the matter of The Petitions of the Keweenaw
Bay Indian Community, Huron Mountain Club, National Wildlife Federation, and
Yellow Dog Watershed Environmental Preserve, Inc., on permits issued to Kennecott
Eagle Minerals Company. A copy of the CD is available on request. |
11/24/09 |
Kennecott (J. Cherry) |
EPA (T. Hyde) |
Letter: Response to 11/18/2009 Request for Information Concerning their Waste Water Treatment Plant (PDF)
(2 pp, 298K) - Includes Link to Treatability Test Report (55 pp, 593K) |
09/29/09 |
The Cadmus Group |
EPA (J. McDonald) |
Analysis & Report (Prepared for EPA): Sections 4.1 through 4.6 of Tribe's Comments - Final (PDF)
(21 pp, 351K) |
09/04/09 |
Honigman (J. Polito) |
EPA (R. Harvey) |
Letter: Tribe's Attorney Addresses Kennecott's 04/28/2009 Letter to EPA (PDF)
(34 pp, 988K) |
06/17/09 |
The Cadmus Group |
EPA (J. McDonald) |
Document (Prepared for EPA): Comments on Additional Information
Related to Class V Treated Water Infiltration System Application (PDF)
(7 pp, 38K) |
04/28/09 |
Kennecott (J. Cherry) |
EPA (R. Harvey) |
Letter: Response to EPA Request for Inventory and Other
Information Concerning Mine Project (PDF)
(11 pp, 2.8M) |
02/20/09 |
Kennecott (J. Cherry) |
EPA (R. Harvey) |
Letter: Response to Cadmus Group Comments Titled
"Comments on Responses to Request for Additional Information (Class V treated Water Infiltration
System Application): Final Report (PDF) (11 pp, 2.1M) |
01/22/09 |
Kennecott (J. Cherry) |
EPA (R. Harvey) |
Letter: Response to EPA's 01/13/2009 Request for Information (PDF) (4 pp, 77K)
Attachment 1:
2008 Background Water Quality Report for Groundwater Discharge Permit
GW1810162 (PDF) (47 pp, 1.4M) |
01/15/09 |
Stratus Consulting (A. Maest) |
EPA (R. Micham) |
Letter: Transmittal of Stratus Report Prepared for Tribe (PDF)
(1 p, 49K)
Tribe Comments in Opposition To Issuance Of
Underground Injection Control Permit to Kennecott ("Stratus Report") (PDF)
(121 pp, 2.6M)
App. A1 - Testimony of Robert Prucha (referenced in Chapter 2) (PDF) (418 pp, 4M)
App. A2 - Testimony of Kenzi Karasaki (referenced in Chapter 2) (PDF) (126 pp, 1.6M)
App. B - FEFLOW (referenced in Chapter 2) and VS2DHI (referenced in Chapter 4) list of input and output files (PDF)
(2 pp, 13k)
WinZip Archive of input and output files (342M)
Run Description.xls (Microsoft Excel file, 1 p, 94 k)
Intervenor's exhibit 214 (referenced in Chapter 2) (PDF) (5 pp, 364k)
Testimony of Glenn Miller (referenced in Chapter 3) (PDF) (143 pp, 1M) |
12/19/08 |
Kennecott (J. Cherry) |
EPA (R. Harvey) |
Letter: Additional Response to EPA's 10/30/2008 Request for
Additional Information (PDF) (37 pp, 6.0M) |
12/05/08 |
Stratus Consulting & Integrated Hydro Systems (A. Maest & R. Prucha) |
EPA (R. Harvey) |
Memo: Summary of Points in Report Prepared on Tribe's Behalf and Soon to be Submitted That Are Most Important to Tribe (PDF)
(7 pp, 49K) |
11/21/08 |
Kennecott (J. Cherry) |
EPA (R. Harvey) |
Letter: Response to EPA's 10/30/2008 Request for Additional
Information (PDF) (11 pp, 2.2M) |
11/14/08 |
Kennecott (J. Cherry) |
EPA (R. Harvey) |
Letter: Response to EPA's 10/30/2008 Request for Additional Informatiion (PDF) (49 pp, 1.6M) |
11/13/08 |
Kennecott (J. Cherry) |
EPA (R. Harvey) |
Letter: Use of a State Bond for Financial Assurance (PDF)
(1 p, 197K)
Letter to Michigan Department of Environmental Quality: 30 Day Construction Notice and
Transmittal of Bond - MP 01 2007 (PDF) (6 pp, 372K)
Updated Surety Bond for Kennecott Eagle Minerals Company
Surface Use Lease L9742 (PDF) (7 pp, 1.0M) |
10/30/08 |
EPA (R. Harvey) |
Kennecott (V. Peacey) |
Letter: Request for Additional Information in Support of UIC
Permit Application (PDF) (2 pp, 73K) |
10/22/08 |
The Cadmus Group |
EPA (J. McDonald) |
Document (Prepared for EPA): Comments on Responses to Request for Additional Information
(Class V Treated Water Infiltration System Application): Final Report (PDF)
(14 pp, 106K) |
08/21/08 |
Kennecott (J. Cherry) |
EPA (R. Harvey) |
Letter: Response to EPA's 07/18/2008 Request for Additional Information (PDF) (68 pp, 2.52M) |
07/18/08 |
EPA (R. Harvey) |
Kennecott (J. Cherry) |
Letter: Request for Additional Information (PDF) (4 pp, 95K) |
07/02/08 |
Kennecott (J. Cherry) |
Michigan DEQ (H. Fitch) |
Letter: 30 Day Construction Notice and Transmittal of Bond - MP 01 2007 (PDF)
(6 pp, 372K) (EPA received a copy December 3, 2008.) |
06/12/08 |
The Cadmus Group |
EPA (J. McDonald) |
Report (prepared for EPA): Class V Treated Water Infiltration System Application Review (PDF)
(40 pp, 1,591KB) |
06/03/08 |
Kennecott (J. Cherry) |
Michigan DNR (T. Wellman) |
Letter: Updated Surety Bond for Surface Use Lease L9742" (PDF) (7 pp, 1,005K)
(EPA received a copy on 12/03/2008) |
05/20/08 |
Great Lakes Indian Fish & Wildlife Commission (J. Coleman) |
EPA (R. Micham) |
Letter: Stormwater in the Kennecott Eagle Mine (PDF)
(2 pp, 37K) |
05/29/07 |
EPA (R. Harvey) |
Kennecott (J. Cherry) |
Letter: Completeness Review of Permit Application (PDF)
(1 p, 29K) |
04/20/07 |
Kennecott (J. Cherry) |
EPA (R. Harvey) |
Letter: Submission of Class V Permit Application (PDF)
(1 p, 41K) (Actual
permit application is filed separately.) |
4/16/07 |
EPA (R. Harvey) |
Kennecott (J. Cherry) |
Letter: Rule Authorization of Large Capacity Septic System (PDF)
(2 pp, 54K) |
03/22/07 |
EPA (J. Traub) |
Kennecott (J. Cherry) |
Letter: Call-In Notification for
Proposed Class V Industrial Process Waste Water Well (PDF)
(13 pp, 6.57M) |
02/2/07 |
Kennecott (J. Cherry) |
EPA (J. Traub) |
Letter: Transmittal of Inventory Sheets for TWIS and sanitary septic system (PDF)
(10 pp, 1,261K) |
01/31/07 |
EPA (J. Traub) |
Kennecott (J. Cherry) |
Letter: Request for UIC Program Information for Eagle Project (PDF)
(5 pp, 216K) |
06/23/06 |
EPA (R. Harvey) |
Honigman (J. Polito) |
Letter: UIC Role in Proposed Underground Injection Wells for Kennecott Eagle Mine (PDF)
(1 p, 35K) |
06/19/06 |
National Wildlife Federation (M. Halley) |
EPA (R. Harvey) |
Letter: Request for EPA to Require UIC Permit for Proposed Underground Injection Wells for Kennecott Eagle Mine (PDF)
(36 pp, 1.8M) |
06/9/06 |
Honigman (J. Polito) |
EPA (R. Harvey) |
Letter: Concerns with Proposed Kennecott Underground Injection Wells (PDF)
(10 pp, 499K) |
03/31/06 |
EPA (R. Harvey) |
Kennecott (J. Cherry) |
Letter: Notification of Inventory Requirements and Request for inventory (PDF)
(4 pp, 222K) |