Note: EPA no longer updates this information, but it may be useful as a reference or resource.
Greenhouse Gas Technology Center
Verified Technologies
The Greenhouse Gas Technology Center verified technologies in the categories listed below. Each category may include a variety of documents, such as verification reports and statements, test/quality assurance plans and verification protocols.
- Advanced energy
- Green buildings/energy efficient
- Greenhouse gas monitoring and others
- Oil and gas industry
- Transportation
Contacts |
---|
Mike Kosusko, EPA Project Officer (919) 541-2734 |
Tim Hansen, Southern Research Institute (919) 282-1052 |
Advanced Energy
Technology Brief: ETV and Animal Feeding Operations (PDF) (2 pp, 1.77 MB) (EPA/600/S-07/012) March 2007
Technology Brief: ETV and Energy (PDF) (2 pp, 94 KB) (EPA/600/F-06/015) June 2009
Technology Brief: Fuel Cells (PDF) (2 pp, 298 KB) (EPA/600/F-06/017) June 2009
Technology Brief: Green Building Technologies (PDF) (2 pp, 256 KB) (EPA/600/F-06/016) October 2006
Technology Brief: Microturbine/Combined Heat and Power (CHP) (PDF) (2 pp, 156 KB) (EPA/600/F-06/018) June 2009
Technology Brief: Waste-to-Energy Technologies (PDF) (2 pp, 112 KB) (EPA/600/S-09/027) October 2009
Company/Technology Name | Verification Report and Statement |
Test/Quality Assurance Plan |
Verification Protocol |
---|---|---|---|
Aisin Seiki Co., Ltd. 6.0-kW Natural Gas-Fired Engine Cogeneration Unit |
Report (PDF) (47 pp, 856 KB)September 2005 Statement (PDF) (5 pp, 116 KB) |
Aisin Seiki 6.0-kW Natural Gas-Fired Engine Cogeneration Unit (PDF) (35 pp, 740 KB) July 2005 | Distributed Generation and Combined Heat and Power Field Testing Protocol (PDF) (106 pp, 1.71 MB) September 2005
Greenhouse Gas (GHG) Verification Guideline Series, Natural Gas-Fired Microturbine Electrical Generators (PDF) (95 pp, 1.69 MB)March 2002 |
Capstone Microturbine Corp. Swine Waste Electric Power and Heat Production – Capstone 30-kW Microturbine System |
Report (PDF) (60 pp, 1.25 MB) September 2004 Statement (PDF) (6 pp, 116 KB) |
Swine Waste Electric Power and Heat Production Systems: Capstone MicroTurbine and Martin Machinery Internal Combustion Engine (PDF) (116 pp, 1.41 MB) November 2002 | |
Capstone Microturbine Corp. Combined Heat and Power at Commercial Supermarket – Capstone 60-kW Microturbine CHP System |
Report (PDF) (83 pp, 2.42 MB)September 2003 Statement (PDF) (8 pp, 284 KB) |
Combined Heat and Power at a Commercial Supermarket, Capstone 60-kW MicroTurbine (PDF) (112 pp, 7.2 MB) November 2002 | |
Climate Energy, LLC. Climate Energy freewatt™ Micro-Combined Heat and Power System |
Report (PDF) (41 pp, 1.34 MB) December 2012 Statement (PDF) (5 pp, 265 KB) |
Climate Energy freewatt™ Micro-Combined Heat and Power System (PDF) (51 pp, 1.3 MB) August 2009 |
|
FuelCell Energy, Inc. DFC 300A Molten Carbonate Fuel Cell |
Report (PDF) (40 pp, 1.36 MB) September 2007 Statement (PDF) (5 pp, 104 KB) |
FuelCell Energy, Inc. – DFC 300A Molten Carbonate Fuel Cell Combined Heat and Power System (PDF) (42 pp, 1.34 MB)March 2007 | |
Honeywell Power Systems, Inc. Parallon 75-kW Turbogenerator |
Report (PDF) (70 pp, 1.47 MB) September 2001 Statement (PDF) (5 pp, 80 KB) |
Honeywell Power Systems, Inc., Parallon 75-kW Turbogenerator (PDF) (110 pp, 1.46 MB) November 2000 | |
Honeywell Power Systems, Inc. Parallon 75-kW Turbogenerator With CO Emissions Control |
Report (PDF) (48 pp, 1.05 MB) September 2001 Statement (PDF) (4 pp, 72 KB) |
||
Ingersoll-Rand Energy Systems IR Power Works 70-kW Microturbine System |
Report (PDF) (77 pp, 1.64 MB)April 2003 Statement (PDF) (6 pp, 216 KB) |
Ingersoll-Rand Energy Systems IR Power Works 70-kW Microturbine System (PDF) (119 pp, 5.28 MB)July 2002 | |
International Fuel Cells Corp. GPU and PC25™ 200-kW Fuel Cell |
Report (PDF) (60 pp, 1.25 MB) August 1998 Statement (PDF) (3 pp, 228 KB) |
Not applicable. | |
Mariah Energy Corp. Heat PlusPower System |
Report (PDF) (95 pp, 2.98 MB) September 2001 Statement (PDF) (5 pp, 80 KB) |
Mariah Energy Corp. Heat PlusPower System (PDF) (124 pp, 6.51 MB)(March 2001) | |
Martin Machinery, Inc. CAT 379 Engine/Generator Set With Integrated Martin Machinery CHP System |
Report (PDF) (43 pp, 836 KB) September 2007 Statement (PDF) (6 pp, 100 KB) |
Electric Power and Heat Production Using Renewable Biogas at Patterson Farms (PDF) (33 pp, 668 KB)April 2007 | |
Martin Machinery, Inc. Swine Waste Electric Power and Heat Production – Martin Machinery Internal Combustion Engine |
Report (PDF) (61 pp, 1.51 MB) September 2004 Statement (PDF) (6 pp, 112 KB) |
Swine Waste Electric Power and Heat Production Systems: Capstone MicroTurbine and Martin Machinery Internal Combustion Engine (PDF) (116 pp, 1.41 MB) November 2002 | |
MIRATECH Corp. GECO 3001 Air/Fuel Ratio Controller (Phase I) |
Report (PDF) (53 pp, 1.69 MB)September 2001 Statement (PDF) (5 pp, 56 KB) |
MIRATECH Corp. GECO 3001 Air/Fuel Ratio Controller (PDF) (66 pp, 4.6 KB) February 2001 | |
MIRATECH Corp. GECO 3001 Air/Fuel Ratio Controller (Phase II) |
Report (PDF) (27 pp, 932 KB) June 2002 Statement (PDF) (4 pp, 52 KB) |
||
NATCO Group, Inc. Paques THIOPAQ Gas Purification Technology |
Report (PDF) (34 pp, 708 KB) September 2004 Statement (PDF) (5 pp, 100 KB) |
Paques THIOPAQ and Shell-Paques Gas Purification Technology (PDF) (62 pp, 736 KB) June 2004 | |
Plug Power Residential Electric Power Generation Using the Plug Power SU1 Fuel Cell System |
Report (PDF) (67 pp, 1.76 MB) September 2003 Statement (PDF) (6 pp, 240 KB) |
Residential Electric Power Generation Using the Plug Power SU1 Fuel Cell System (PDF) (97 pp, 1.13 MB) March 2003 | |
Tecogen Tecogen Model CM-100 |
Report (PDF) (39 pp, 951 KB) May 2012 Statement (PDF) (8 pp, 230 KB) |
Building Energy Solutions, LLP Tecogen DG/CHP Installation (PDF) (40 pp, 678 KB)July 2008m | |
US Filter/Westates Carbon UTC Fuel Cells PC25C Power Plant – Gas Processing Unit Performance for Anaerobic Digester Gas |
Report (PDF) (32 pp, 744 KB)September 2004 Statement (PDF) (7 pp, 184 KB) |
Electric Power and Heat Generation Using the UTC PC25 Fuel Cell Power Plant and Anaerobic Digester Gas (PDF) (108 pp, 1.39 MB)January 2004 | |
UTC Fuel Cells, LLC Electric Power and Heat Generation using UTC Fuel Cells’ PC25C Power Plan and Anaerobic Digester Gas |
Report (PDF) (54 pp, 1.14 MB) September 2004 Statement (PDF) (6 pp, 112 KB) |
||
Electric Power and Heat Production Using Renewable Biogas at a Dairy Farm (PDF) (97 pp, 912 KB) March 2004 | |||
OfficePower, Inc. Elliott Microturbine DG / CHP Installation (PDF) (40 pp, 1.2 MB) April 2008 |
Green Buildings/Energy Efficient
Technology Brief: ETV and Energy (PDF) (2 pp, 94 KB) (EPA/600/F-06/015) June 2009
Technology Brief: Green Building Technologies (PDF) (2 pp, 256 KB) (EPA/600/F-06/016) October 2006
Technology Brief: Waste-to-Energy Technologies (PDF) (2 pp, 112 KB) (EPA/600/S-09/027) October 2009
Company/Technology Name | Verification Report and Statement |
Test/Quality Assurance Plan |
Verification Protocol |
---|---|---|---|
ECR Technologies, Inc. EarthLinked Ground-Source Heat Pump Water Heating System |
Report (PDF) (46 pp, 644 KB) September 2006 Statement (PDF) (7 pp, 132 KB) |
ECR Technologies, Inc., Earthlinked Ground-Source Heat Pump Water Heating System (PDF) (49 pp, 984 KB)May 2005 Addendum, May 2006 |
Not applicable. |
Greenhouse Gas Monitoring and Others
Company/Technology Name | Verification Report and Statement |
Test/Quality Assurance Plan |
Verification Protocol |
---|---|---|---|
ANR Pipeline Company, A Subsidiary of the Coastal Corp. Parametric Emissions Monitoring System (PEMs) |
Report (PDF) (48 pp, 1.83 MB)June 2000 Statement (PDF) (4 pp, 64 KB) |
ANR Pipeline Co. Parametric Emissions Monitoring System (PEMS) (PDF) (53 pp, 872 KB) July 1999 | Greenhouse Gas (GHG) Verification Guideline Series, Parametric Emissions Monitoring System (PEMs) (PDF) (53 pp, 724 KB)September 2001 |
KMC Controls, Inc. SLE-1001 Sight Glass Monitor |
Report (PDF) (47 pp, 1.03 MB) September 2001 Statement (PDF) (4 pp, 44 KB) |
KMC Controls, Inc., SLE-1001 Sight Glass Monitor (PDF) (71 pp, 2.6 MB) July 2001 | Not applicable. |
Oil and Gas Industry
Technology Brief: Eductor Vapor Recovery Unit (EVRU) (PDF) (2 pp, 224 KB) (EPA/600/S-07/029) August 2007
Company/Technology Name | Verification Report and Statement |
Test/Quality Assurance Plan |
Verification Protocol |
---|---|---|---|
A&A Environmental Seals, Inc. Seal Assist System (Phase I) |
Report (PDF) (84 pp, 4.53 MB) September 1999 Statement (PDF) (4 pp, 64 KB) |
A&A Environmental Seals' Seal Assist System (SAS) (PDF) (56 pp, 1.02 MB) December 1998 | Greenhouse Gas (GHG) Verification Guideline Series, Natural Gas Compressor Leak Mitigation Technologies (PDF) (52 pp, 1.44 MB)October 1999 |
A&A Environmental Seals, Inc.
Seal Assist System (Phase II) |
Report (PDF) (66 pp, 3.27 MB)September 2000 Statement (PDF) (4 pp, 48 KB) |
||
C. Lee Cook Division, Dover Corp.
Static Pac (Phase I) |
Report (PDF) (48 pp, 2.69 MB) September 1999 Statement (PDF) (3 pp, 52 KB) |
C. Lee Cook Division, Dover Corp. Static Pac System (PDF) (53 pp, 2.69 MB) July 1999 | |
C. Lee Cook Division, Dover Corp.
Static-Pac (Phase II) |
Report (PDF) (70 pp, 4.48 MB) September 2000 Statement (PDF) (4 pp, 44 KB) |
||
COMM Engineering, USA
Environmental Vapor Recovery Unit (EVRU) |
Report (PDF) (49 pp, 1.67 MB) September 2002 Statement (PDF) (5 pp, 60 KB) |
COMM Engineering, USA, EVRU (PDF) (81 pp, 3.59 MB) April 2002 | |
Engineering Concepts, LLC
Quantum Leap Dehydrator |
Report (PDF) (91 pp, 2.56 MB) September 2003 Statement (PDF) (7 pp, 224 KB) |
Engineered Concepts, LLC, Quantum Leap Dehydrator (PDF) (90 pp, 2.12 MB) June 2002 | |
France Compressor Products
Emissions Packing (Phase I) |
Report (PDF) (49 pp, 3.35 MB)September 1999 | France Compressor Products Emissions Packing (PDF) (41 pp, 428 KB)July 1999 | |
JCH Fuel Solutions, Inc. Automated Fuel Cleaning and Maintenance System |
Report (PDF) (64 pp, 1.21 MB) April 2002 Statement (PDF) (5 pp, 64 KB) |
JCH Fuel Solutions, Inc., JCH Enviro Automated Fuel Cleaning and Maintenance System (PDF) (98 pp, 4.78 MB) July 2001 | |
The Protectoseal Co.
Pin-Tech Bubble Tight <500 ppm Relief Vent |
Report (PDF) (31 pp, 880 KB)May 2000 Statement (PDF) (3 pp, 48 KB) |
The Protectoseal Company's Pin-Tech Pressure Relief Valves (PDF) (27 pp, 420 KB) July 1999 |
Transportation
Company/Technology Name | Verification Report and Statement |
Test/Quality Assurance Plan |
Verification Protocol |
---|---|---|---|
ConocoPhillips Fuel-Efficient High-Performance (FEHP) SAE 75W90 Rear Axle Gear Lubricant |
Report (PDF) (99 pp, 4.05 MB)August 2003 Statement (PDF) (7 pp, 316 KB) |
ConocoPhillips Fuel-Efficient High-Performance SAE 75W90 Rear Axle Gear Lubricant (PDF) (84 pp, 2.73 MB)March 2003 | Not applicable. |
EnviroFuels, L.P. Diesel Fuel Catalyzer Fuel Additive |
Report (PDF) (71 pp, 2.86 MB) August 2005 Statement (PDF) (8 pp, 268 KB) |
EnviroFuels Diesel Fuel Catalyzer Fuel Additive (PDF) (47 pp, 928 KB)August 2004 | |
New Condensator, Inc. The Condensator Diesel Engine Retrofit Crankcase Ventilation System |
Report (PDF) (37 pp, 840 KB) August 2005 Statement (PDF) (6 pp, 168 KB) |
New Condensator, Inc. – The Condensator Diesel Engine Retrofit Crankcase Ventilation System (PDF) (51 pp, 892 KB)December 2004 | |
Taconic Energy, Inc. TEA Fuel Additive |
Report (PDF) (35 pp, 771 KB) April 2013 Statement (PDF) (4 pp, 209 KB) |
Taconic Energy, Inc. TEA Fuel Additive (PDF) (60 pp, 844 KB) October 2010 |
|
American Clean Energy Systems, ACES-II Diesel Additive (PDF) (48 pp, 1.41 MB)October 2006 | |||
Universal Cams, LLC, Dynamic Cam Diesel Engine Retrofit System (PDF) (53 pp, 980 KB) June 2004 | |||
White Sands, LLC – CleanBoost Combustion Catalyst Diesel Fuel Additive (PDF) (57 pp, 964 KB) December 2004 |