WIPP Repository Reconfiguration

On August 30, 2011, the U.S. Department of Energy (DOE) provided a proposed planned change request that will relocate Panels 9 and 10 from the main north-south access drifts to south of the existing Panels 4 and 5 in the WIPP repository. Complete details of the repository reconfiguration planned change request (including an overview presentation provided at an August 2011 technical meeting) are below.

You may need Adobe Reader to view files on this page. See EPA’s About PDF page to learn more.