Jump to main content.


Note: EPA no longer updates this information, but it may be useful as a reference or resource.

Please see www.epa.gov/nsr for the latest information on EPA's New Source Review program.

October 14, 1988 Final Determinations Regarding the Applicability of the Clean Air Act's New Source Performance Standards (NSPS) and Prevention of Significant Deterioration (PSD) Requirements to the Proposed Life Extension Project at the Port Washington Steam Electric Generating Station 4.38

This is the final applicability determination regarding the proposed Port Washington steam electric generating station. The renovations constitute physical changes for PSD purposes, and do not come within the exclusions for routine maintenance, repair, replacement; or for production rate or hours of operation. The renovations will result in a significant net increase in emissions of several pollutants for PSD and NSPS purposes, and are, therefore, subject to both PSD and NSPS requirements, unless the project is reconfigured.
Notebook Entries: 2.29

View Entire Document
Download Entire Document in PDF Format


Local Navigation


Jump to main content.