March 31, 1988 Transmittal of OAQPS Interim Control Policy Statement 8.25
THE TEXT YOU ARE VIEWING IS A COMPUTER-GENERATED OR RETYPED VERSION OF A
PAPER PHOTOCOPY OF THE ORIGINAL. ALTHOUGH CONSIDERABLE EFFORT HAS BEEN
EXPENDED TO QUALITY ASSURE THE CONVERSION, IT MAY CONTAIN TYPOGRAPHICAL
ERRORS. TO OBTAIN A LEGAL COPY OF THE ORIGINAL DOCUMENT, AS IT
CURRENTLY EXISTS, THE READER SHOULD CONTACT THE OFFICE THAT ORIGINATED
THE CORRESPONDENCE OR PROVIDED THE RESPONSE.
8.25
MEMORANDUM
FROM: John S. Seitz, Director
TO: Air Management Division Directors
Air and Waste Management Division Director
Air, Pesticides and Toxics Management Division
Air and Toxics Division Directors
Air and Radiation Division Director Attached is the final Interim Control Policy for developing compliance schedules that require replacement or upgrading of existing air pollution control equipment. Comments solicited from the Air Compliance and Air Programs Branch Chiefs, OECM, and SSCD by a memorandum of January 20, 1988, have been addressed, resulting in a few minor language clarifications and one change to the policy. The change resulted from a comment on the requirement to maintain existing controls in the interim. In lieu of maintaining the operation of the existing control equipment during the interim period, allowance has been made for installing interim controls which may be more effective in reducing emissions. The usage of interim controls may not result in a delay of the installation of the final control equipment. Also, clarification has been made concerning the installation of redundant equipment on new control systems. Design requirements mentioned in this policy apply to those sources which require continuous operation of the process equipment. Temporary shutdown during maintenance periods is always a possible compliance alternative to adding redundant control equipment. The policy now states this specifically. One notable recommended change has not been included. The comment was made that performance bonds should not be applied to activities which may be beyond the control of the source, such as the delivery of materials. Installation of control equipment frequently involves the activities of several contractors and requires careful scheduling to avoid delays. Late delivery of equipment can have a serious adverse effect on the ability of a source to meet a tight installation schedule. A source must take the necessary steps to select the most reliable, rather than the lowest cost vendor, to ensure that schedules are met. Thank you for your assistance with the development of this policy statement. If you have questions concerning it, please contact Pam Saunders of my staff at FTS 382-2889, EMail EPA6264. Attachment
PURPOSE The purpose of this policy is to provide uniform criteria for developing final compliance requirements, schedules, and interim requirements for sources in situations where failing, deteriorating or inadequate air pollution control equipment must be replaced or upgraded. APPLICABILITY This policy applies to situations where a determination to rebuild or replace existing control equipment has been made. Situations mentioned in this policy may also be subject to applicable civil penalties as stated in the Civil Penalty Policy. OBJECTIVES
POLICY INTERIM MEASURES Interim measures combined with continued operation and maintenance of existing controls must be required wherever existing controls are inadequate. During the interim period until the new or upgraded control equipment is operational and the source is in compliance, emissions from the source must not be allowed to increase. The existing though inadequate control equipment must remain operational to the maximum extent possible, including being maintained and
repaired, until such time that construction or tie-in of new equipment requires its shutdown or removal. In lieu of maintaining the existing though inadequate control equipment, interim controls which offer a higher degree of emission reduction and are readily and reasonably available may be installed. The use of such interim controls shall not unduly delay the installation of final control equipment. When existing control equipment must be taken off line to tie-in or complete construction of new or upgraded equipment, additional interim controls or other interim measures are required to ensure no increase in excess emissions occurs during the tie-in period. Such measures may include installation of additional temporary control equipment or operational controls, e.g., curtailment of production rates, relocation of production to complying process lines or facilities, purchase of power or product elsewhere as needed, or temporary shutdown. The source should be required to implement an interim continuous emissions monitoring program, to enable the agency to monitor the emissions performance of the source during the interim period. COMPLIANCE REQUIREMENTS All compliance schedules must contain specific milestones for design, construction, installation and operation of new or rebuilt control equipment. The milestones should reflect the shortest feasible schedule for achieving compliance and should include, but not be limited to, the following:
Performance bonds or stipulated penalties must be associated with every milestone specified in the schedule. To promote an expeditious schedule, the use of prefabricated equipment or the use of double or triple shifts for the construction or installation of equipment should be considered. CONTINUOUS COMPLIANCE AND MONITORING REQUIREMENTS A fundamental principle of this policy is that the source must make every possible effort to maintain continuous compliance after the new or rebuilt equipment becomes operational. To assure continuous compliance during future maintenance periods, all new or upgraded equipment must normally include spare compartments (or units) and parts (or equipment) that can maintain emissions at a compliance level while the remainder of the equipment is being replaced, repaired, or maintained. In lieu of this, those sources that do not require continuous availability of the process equipment may shut down during such periods.
To assure the ability of the agency to monitor continuous compliance in
the future, the source must periodically report excess emissions to the
appropriate air pollution control agency. This may be accomplished by
requiring the installation, operation and reporting of data from continuous
emissions monitoring equipment. These requirements are to be set out
specifically in the compliance agreement.
|