Note: EPA no longer updates this information, but it may be useful as a reference or resource.
Please see www.epa.gov/nsr for the latest information on EPA's New Source Review program.
May 27, 1980 New Source Review Requirements in Areas Unclassified for Ozone 5.6
THE TEXT YOU ARE VIEWING IS A COMPUTER-GENERATED OR RETYPED VERSION OF A
PAPER PHOTOCOPY OF THE ORIGINAL. ALTHOUGH CONSIDERABLE EFFORT HAS BEEN
EXPENDED TO QUALITY ASSURE THE CONVERSION, IT MAY CONTAIN TYPOGRAPHICAL
ERRORS. TO OBTAIN A LEGAL COPY OF THE ORIGINAL DOCUMENT, AS IT
CURRENTLY EXISTS, THE READER SHOULD CONTACT THE OFFICE THAT ORIGINATED
THE CORRESPONDENCE OR PROVIDED THE RESPONSE.
5.6
MEMORANDUM: SUBJECT: New Source Review Requirements in Areas Unclassified for Ozone
FROM: Richard G. Rhoads, Director
TO: Allyn M. Davis, Director Any person who desires to construct a new major source of volatile organic compounds in a rural area designated as "unclassifiable" for ozone has three basic options as follows: 1. Agree to apply best available control technology; conduct an ambient monitoring program under the PSD regulations; and submit, as part of their permit application, proof that the area is attainment for ozone. (Such ambient data must be submitted before the permit application can be considered complete.) 2. Agree to meet the lowest achievable emission rate and obtain adequate emission offsets. [LAER and the offsets must be enforceable at the time of permit issuance, and the offsets must (in most cases) be achieved prior to initial operation of the new source.] 3. Agree to meet the lowest achievable emission rate, and EPA must have approved regulations that require application of reasonably available control technology on all existing 100-ton or greater sources for which control technique guidelines have been issued. (The latter requirement represents the basic feature of a rural control strategy, and that strategy must be approved by EPA prior to issuance of the permit.) All other requirements of the PSD program or the offset program must, of course, be met. You should specifically note that the permit could not be issued until:
The above requirements are specified in the PSD regulations, the offset ruling, and the Administrator's February 24, 1978 memorandum. In addition, I am attaching several memos which provide further details of these requirements. Attachments
cc: Jack Divita
bcc: E. Tuerk |