Environmental Modeling Public Meeting - 2010 Agendas

The agenda is provided here as a courtesy and service so that presentation subjects and authors can be easily searched.

Detailed information from 2010 is available in the docket using this id: EPA-HQ-OPP-2009-0879

On this page:


Agenda of the July 27, 2010 Exposure Modeling Public Meeting

July 2010 EMPM Agenda and Abstracts
PRESENTER Time TOPIC Duration
Peck/Baris 9:00 am Welcome and Introduction 5 minutes
Michael Barrett, U.S. EPA
Ian Kennedy, PMRA
9:05 am A Look at Prospective Ground-Water Monitoring Studies and their Utility for Developing Leaching Models 35 minutes
Marty Williams, P.E., Waterborne Environmental Inc. 9:40 am Screening Approaches for Predicting Pesticide Concentrations in Groundwater 35 minutes
  10:15 am Break 10 minutes
David Valcore, Valcore Consulting
Harold Thistle, USDA
10:25 am Mechanistic Ground Spray Boom Drift Model Development 35 minutes
Nathan Snyder, Waterborne Environmental Inc. 11:00 am Using Modern Watershed and Cropping Data as a Basis for Estimating Percentage Crop Treatment 35 minutes
Jack Barbash and Frank Voss, USGS 11:35 am Design and Testing of a Process-Based Groundwater Vulnerability Assessment (P-GWAVA) System for Predicting the Concentrations of Agrichemicals in Ground Water Across the Conterminous United States Using Data from the National Water-Quality Assessment (NAWQA) Program 35 minutes
  12:10 pm Lunch 80 minutes
Michael Winchell, Stone Environmental
Russell Jones, Bayer Cropscience
1:30 pm Comparison of Models for Estimating the Removal of Pesticides by Vegetative Buffer Strips 35 minutes
Marty Williams, P.E., Waterborne Environmental Inc. 2:05 pm Advances in Modeling Urban/Residential Pesticide Runoff 35 minutes
  2:40 pm Break 5 minutes
Nick Poletika, Dow Agrosciences 2:45 pm Spray Drift Exposure Refinements for Salmonid Off-Channel Habitat 35 minutes
Mark Velleux, HydroQual, Inc 3:20 pm Spatially-Distributed Watershed Model for Chemical Exposure Assessment: Case Study of Antimicrobial Copper Uses in Urbanized Areas 35 minutes
Peck/Baris 3:55 PM Wrap-up, Next Meeting 5 minutes
Peck/Baris 4:00 PM Adjournment