On November 10, 2014, EPA published in the Federal Register our final SIP and FIP GHG actions as follows: 1). The final action to rescind a majority of the Federal Implementation Plan (FIP) for Texas for greenhouse gas (GHG) Prevention of Significant Deterioration (PSD) permitting, titled “Approval and Promulgation of Air Quality Implementation Plans; Withdrawal of Federal Implementation Plan; Texas; Prevention of Significant Deterioration; Greenhouse Gas Tailoring Rule Revisions;” and 2). The final approval of the majority of the revisions to the Texas State Implementation Plan (SIP) submitted by the Texas Commission on Environmental Quality (TCEQ), titled “Approval and Promulgation of Air Quality Implementation Plans; Texas; Prevention of Significant Deterioration; Greenhouse Gas Tailoring Rule Revisions.”
Application
| Date of Application Submittal
| Completeness Determination
| Permits
| Statement of Basis
| Public Notice
| Other Supporting Information
|
Air Liquide Large Industries, Bayou Cogeneration Plant
| App Received: Sept-18-2012
Response to info request: 08/09/13
Draft Response to RFI
Comment Received
Response Comment Nov-21-13
| Previous Incomplete
| Draft Permit (Aug-2013)
Final Permit (Nov-2013)
| Statement of Basis
| Public Notice
Transmittal Letter
“No requests were received by September 23, 2013 for a public hearing, therefore, the previously planned public hearing for October 7, 2013 was cancelled.”
Public Comment Period extended until Oct-14-2013
Transmittal Letter 11-20-13
Final Public Notice
| Final Biological Assessment
Final Cultural Report
|
Apex Bethel Energy Center
Anderson County, Texas
| App Received: Jun-22-2012
Response: Oct-12-2012
| Previous Incomplete
| Draft Permit (Dec 2013)
Final Permit (Mar 2014)
| Statement of Basis
Basis of Decision
| Public Notice
Draft Permit Letter
“No requests were received by January 17, 2014 for a public hearing, therefore, the previously scheduled public hearing for January 28, 2014 was cancelled.”
SHPO Comments”
| Final Biological Assessment”
SHPO concurrence
Final Cultural Resources Report
|
APEX Matagorda Energy Center, LLC
| App Received: Nov-27-2012
| Previous Incomplete
| Draft Permit (Feb-5-14)
Final Permit (Apr-14-14)
| Statement of Basis
Basis of Decision
| Public Notice
Transmittal Letter
“No requests were received by February 25, for a public hearing, therefore, the previously scheduled public hearing for March 13, 2014 has been cancelled.”
| Final Cultural Report
Final Biological Assessment
|
Application
| Date of Application Submittal
| Completeness Determination
| Permits
| Statement of Basis
| Public Notice
| Other Supporting Information
|
Austin Energy Sand Hill Energy Center
| App Received: Sept-13-2013
Revised App Pages Oct-18-2013
Pre-Application Letter
Combined App 09-13-13
Response to EPA 01-28-14
Response to EPA 01-28-14
Cover Letter 04-11-14
Revised Application 04-11-14
email to EPA 06-2014
|  | Draft Permit (Aug-2014)
Summary of Revisions in Final Permit
Final Permit (Sept 2014)
Revised Final Permit (Sept 29, 2014)
| Statement of Basis
| Public Notice
Proof of Publication
“No requests were received by August 27, 2014 for a public hearing, therefore, the previously scheduled public hearing for September 16, 2014 was cancelled.”
Final Public Notice - Sept-29-2014
Final Transmittal Letter
| Draft Final Cultural Report
DraftBiological Assessment
|
BASF Fina LP GHG Application
| App Received: May-17-2011
Date of Revised: Jan 2012
| Complete
| Draft Permit (Apr-23-2012)
Summary of Revisions in Final Permit
Final Permit (Aug 2012)
| Statement of Basis
| Public Notice - Apr-26-2012
Transmittal Letter
Proof of Publication
"No requests were received by May 23, 2012 for a public hearing, therefore, the previously planned public hearing for June 4, 2012 was cancelled."
Final Transmittal Letter
| Final Cultural Report
Final Biological Assessment
Final Essential Fish Habitat Assessment
Addendum to Final Biological Assessment
|
C3 Petrochemicals LLC
| App Received: Feb-12-2013
Resp to Completion Determination
Revised App: Feb-2014
Response: Mar-2014
| Previous Incomplete
| Draft Permit (May 2014)
Final Permit (June 2014)
Signed Letter (June 2014)
| Statement of Basis
Basis for Decision
| Public Notice May-9-2014
"No requests for a public hearing were received as of May 30, 2014, therefore the previously planned public hearing for June 23, 2014 was cancelled."
| Draft Final Biological Assessment
NHPA Agreement
Final Cultural Resources Report Addendum – Linear Facilities
Final Cultural Resources Report
Essential Fish Habitat Report
|
Application
| Date of Application Submittal
| Completeness Determination
| Permits
| Statement of Basis
| Public Notice
| Other Supporting Information
|
Calpine Deer Park GHG Application
| App Received: Sept-01-2011
| Previous Incomplete
Complete
| Draft Permit (Aug-2012)
Final Permit (Nov 2012)
Summary of Revisions to Final Permit
| Statement of Basis
Additional Info to the Statement of Basis
| Public Notice 08-02-2012
Transmittal Letter
Proof of Public Notice
"No requests were received by August 29, 2012 for a public hearing, therefore, the previously planned public hearing for September 5, 2012 was cancelled."
| Final Biological Assessment
Final Cultural Report
Final Essential Fish Habitat Report
Addendum to Biological Report
|
Calpine-Channel Energy Center
| App Received: Nov-03-2011
| Complete
| Draft Permit (Aug 2012)
Final Permit (Nov 2012)
Summary of Revisions to Final Permit
| Statement of Basis
Additional Info to Statement of Basis
| Public Notice 08-30-2012
Transmittal Letter
Public Notice Proof
No requests were received by September 27, 2012 for a public hearing, therefore, the previously planned public hearing for October 3, 2012 was cancelled."
| Final Biological Assessment
Final Cultural Report
Final Essential Fish Habitat Report
Addendum to the Biological Assessment
|
CCI Corpus Christi, LLC
Condensate Splitter Facility Nueces County, Tx
| App Received: Nov-04-2013
Revised App: Mar-2013
Information Request 03-27-14
Response 04-28-14
Request to Process App 05-09-14
ROC 05-14-14
Response 05-21-14
|  | Draft Permit (Aug-2014)
Final Permit (Sept-2014)
Summary of Revisions to Final Permit
| Statement of Basis (July 2014)
| Public Notice (Aug-6-2014)
Transmittal Letter (Aug-6-2014)
"No requests were received by August 27, 2014 for a public hearing, therefore, the previously planned public hearing for September 16, 2014 was cancelled"
Proof of Publication
Final Public Notice
Final Transmittal Letter
| Draft Cultural Report
Draft Final Biological Assessment
Final Essential Fish Habitat Report
|
Celanese Clear Lake Plant
| App Received: Aug-10-2012
Response
Boiler Plate Conditions
Process Flow Diagram
Methanol Loading
Overview Presentation
Supplemental Info
Revised App 06-14-2013
Other Supporting Docs
Supplemental Info 11/08/13
| Previous Incomplete
| Draft Permit (Aug 2013)
Final Permit (Dec 2013)
| Draft Statement of Basis
| Public Notice
Transmittal Letter
Proof of Publication
“No requests were received by July 17, 2013 for a public hearing, therefore, the previously planned public hearing for July 29, 2013 was cancelled.”
Final Transmittal Letter
Response to Public Comments
Final Public Notice
| Final Cultural Report
Final Biological Assessment
Public Comments
Cost Effective Analysis
|
Application
| Date of Application Submittal
| Completeness Determination
| Permits
| Statement of Basis
| Public Notice
| Other Supporting Information
|
Chevron Phillips Chemical Co., Cedar Bayou Plant
| App Received: Dec-19-2011
Response March-19-2012
| Previous Incomplete
Complete
| Draft Permit (Oct 2012)
Letter to Permitee
Final Permit (Jan 2013)
Summary of Revisions
| Statement of Basis
| Public Notice
"No requests for a public hearing were received as of Dec 13, 2012, therefore the previously planned public hearing for Dec 19, 2012 was cancelled"
Transmittal Letter
| Final Biological Assessment
Final Cultural Report
|
Chamisa CAES at Tulia, LLC
| App Received: Nov-06-2012
Response to Completeness Determination
Response to EPA 07-29-2013
Response to EPA 01-26-2014
| Previous Incomplete
| Draft Permit (Feb 2014)
Final Permit (March 2014)
Summary of Revisions
| Statement of Basis
| Transmittal Letter
Public Notice
"The permitting authority, having determined there was not a significant degree of interest in the draft permit, cancelled the public hearing previously scheduled for March 18, 2014."
Final Public Notice
Final Transmittal Letter
| Final Biological Assessment
Final Cultural Report
|
Application
| Date of Application Submittal
| Completeness Determination
| Permits
| Statement of Basis
| Public Notice
| Other Supporting Information
|
Copano Processing L.P.
Houston Central Gas Plant
Colorado County, Sheridan, Tx
| App Received: Jun-6-2012
Response August-06-2012
Revised App Oct-01-2012
Revised App Dec-07-2012
Turbine Perf. Std.
| Previous Incomplete
Complete
| Draft Permit (Jan 2013)
Final Permit (Mar 2013)
Summary of Revisions
| Statement of Basis
| Revised Public Notice
Transmittal Letter
Proof of Public Notice
"No requests for a public hearing were received as of February 11, 2013, therefore the previously planned public hearing for February 27, 2013 was cancelled."
Transmittal Letter
| Final Cultural Report
Final Biological Assessment
|
Application
| Date of Application Submittal
| Completeness Determination
| Permits
| Statement of Basis
| Public Notice
| Other Supporting Information
|
Diamond Shamrock Company, Valero McKee Refinery
|
App Received: Dec-01-2011
Response Aug-6-2012
Date of Revised App: Dec-2012
Revised App June 13, 2013
Supplemental Information
| Previous Incomplete
| Draft Permit (Jul 2013)
Final Signed Permit (Sept 2013)
Summary of Revisions
Final Signed Transmittal Letter
| Statement of Basis
| Public Notice
No requests were received by August 27, 2013 for a public hearing, therefore, the previously planned public hearing for September 19, 2013 was cancelled.
Draft Permit Letter to Company
Proof of Publication
| Final Cultural Report
Final Biological Assessment
|
DCP Midstream, LP - Hardin County NGL Fractionation Plant
| See withdrawn applications below this table
|  |  |  |  |  |
DCP Midstream NGL Fractionation Plant - Jefferson County
| App Received: July-10-2012
Revised App - Feb 2013
Revised App Cover Letter
Heater Efficiency
Cost Estimate
DCP email
| Previous Incomplete
| Draft Permit (Aug 2013)
Final Permit (Oct 2013)
Response to Comments | Statement of Basis
DCP Comments on Statement of Basis
| Public Notice
Transmittal Letter
The permitting authority, having determined there was not a significant degree of interest in the draft permit, cancelled the public hearing previously scheduled for September 18, 2013.
Public Notice
Final Public Notice
Final Transmittal Letter
| Final Biological Assessment
Final Cultural Report
|
DOW Chemical Company (Freeport), Light Hydrocarbon 9
| App Received:
Dec-4-2012
Revised application 09-20-2013
Consolidated Application 09-13-2013
| Previous Incomplete
Response to Incomplete Determination 07-09-2013
| Draft Permit (Mar 2014)
Final Permit (May 2014)
| Statement of Basis
| Public Notice
Public Notice Approval Letter
The permitting authority, having determined there was not a significant degree of interest in the draft permit, cancelled the public hearing previously scheduled for April 17, 2014
Public Notice Response to Comments (RTC)
RTC 05-20-14
| Draft Final Cultural Report – Site Facility
Draft Final Cultural Report – Pipeline
Comment Received 04-10-14
SHPO Concurrence
FWS Concurrence
Final Biological Assessment
|
Application
| Date of Application Submittal
| Completeness Determination
| Permits
| Statement of Basis
| Public Notice
| Other Supporting Information
|
El Paso Electric Company - Montana Power Station
| App Received: Apr-20-2012
Response - Aug 2012
El Paso Proposed GHG BACT Limits Sept-21-2012
Supplemental Info - Jan 2014
| Previous Incomplete
Complete
| Draft Permit (Sept 2013)
Response to Public Comments (Mar 2014)
Final Permit (Mar 2014)
| Statement of Basis
| Public Notice
Public Notice in Spanish
Transmittal Letter
Proof of Public Notice
Request for Public Meeting
Reply to Request for Public Meeting
Request for Extension for Public Comments
EPA Comments on Request for Extension
Comments Period Extended thru Nov 6th
Request for Extension for Public Comments: Nov-06-2013
Comment Periond Extended thru Dec 4th
Public hearing transcript
Public Comments re-posted 1/7/13 (large 32 mB file)
Final Public Notice
Final Transmittal Letter
Revised Comment Index
| 1st Consultation Letter Sent to Historic Tribal Nations with Texas Interests 08-01-13
2nd Consultation Letter Sent to Historic Tribal Nations with Texas Interests 08-22-13
Commitment Letter
Final Biological Assessment
Final Cultural Report
SHPO Concurrence Request
SHPO Concurrence Response
|
Enterprise Products Operating, Mont Belvieu Complex
Eagleford Fractionation and DIB Units
| Revised App: May 2012
Response May-2012
| Previous Incomplete
Complete
| Draft Permit (Aug 2012)
Final Permit (Oct 2012)
Final Permit Summary of Revisions
| Statement of Basis
| Public Notice
Notification
Proof of Public Notice
"No requests were received by August 31, 2012 for a public hearing, therefore, the previously planned public hearing for September 12, 2012 was cancelled."
Final Transmittal Letter
| Final Biological Assessment
Final Cultural Report
|
Enterprise Products Mont Belvieu Propane Dehydrogenation Unit.
| App Received: Dec-19-2012
Response 06-21-2013
Attendee List 07-02-2013
Response 07-15-2013
Response 07-26-2013
Response 08-23-2013
Flare Emissions 01-02-2014
Nat Gas Analysis
CO2 CEMs Resp
Response 01-20-2014
Email 01-21-2014
Response 01-29-2014
ghg factor Response 02-12-2014
Response 02-21-2014
Comb Unit Emissions
| Previous Incomplete
| Draft Permit (Mar 2014)
Response to Public Comments
Final Permit (Apr 2014)
| Statement of Basis
| Public Notice
Public Notice Cover Letter
"No requests for a public hearing were received by April 1, 2014, therefore, the previously planned public hearing for April 23, 2014 was cancelled."
Proof of Public Notice
Final Transmittal Letter
Final Public Notice
| Draft Final Cultural Report
Public Comment 04-07-14
Final Biological Assessment
|
ETC Texas Pipeline-Jackson
| Revised App Mar-15-2012
| Previous Incomplete
Complete
| Draft Permit (Mar 2012)
Final Permit (May 2012)
Final Permit Revision Summary
| Statement of Basis
Final Statement of Basis
| Public Notice
Transmittal Letter
Proof of Publication
"No requests were received by April 19, 2012 for a public hearing, therefore, the previously planned public hearing for April 26, 2012 was cancelled."
Final Permit Public Announcement
Final Permit Transmittal Letter
| Final Cultural Report
Final Biological Assessment
EJ Report
|
Application
| Date of Application Submittal
| Completeness Determination
| Permits
| Statement of Basis
| Public Notice
| Other Supporting Information
|
Equistar Chemical, Olefins Plant Expansion Project - Corpus Christi Complex
| App Received: Mar-6-2013
Revised App Received: Oct-22-2013
Additional Info
Additional Info
Response 02-25-14
|  | Draft Permit (Feb 2014)
Final Permit (Apr 2014)
Summary of Revisions
| Statement of Basis
| Public Notice
Transmittal Letter
“The permitting authority, having determined there was not a significant degree of interest in the draft permit, cancelled the public hearing previously scheduled for April 23, 2014.”
Signed Transmittal Letter
| Draft Cultural Report
Final Biological Assessment
Final Essential Fish Habitat Report
|
Equistar Chemicals, Channelview, Olefins 1 & 2 Expansion - Channelview, Tx
| Olefins 1: Revised May 15-2012
Olefins 2: Revised May 15-2012
Heater Efficiency Calculations
Follow-up Response
Response to EPA
| Previous Incomplete
| Draft Permit (May 2013)
Final Permit (Jul 2013)
Summary of Revisions
| Statement of Basis
| Public Notice
Proof of Public Notice
“No requests were received by June 17, 2013 for a public hearing, therefore, the previously planned public hearing for June 26, 2013 was cancelled.”
Signed Transmittal Letter
| Final Cultural Report
Final Essential Fish Habitat Report
Final Biological Assessment
|
Equistar Chemicals, La Porte Complex
| App Received: Sept-29-2011
Revised App: May 2012
Furnace Decoking
Furnace Efficiency Calculations
| Previous Incomplete
Complete
| Draft Permit (Jan 2013)
Final Permit (Mar 2013)
Transmittal Letter
| Statement of Basis
| Public Notice
Transmittal Letter
No requests were received by February 20, 2013 for a public hearing, therefore, the previously planned public hearing for March 4, 2013 was cancelled.
| Final Essential Fish Habitat
Final Biological Assessment
Final Cultural Report
|
Equistar Chemicals, Channelview, Methanol Unit
| App Received: Oct-27-2011
Revised App - July 2012
| Previous Incomplete
Complete
| Draft Permit (Dec 2012)
Final Permit (Feb 2013)
Summary of Revisions
Transmittal Letter
| Statement of Basis
| Public Notice
Transmittal Letter
Proof of Public Notice
No requests were received by February 1, 2013 for a public hearing, therefore, the previously planned public hearing for February 13, 2013 was cancelled
| Final Cultural Report
Final Biological Assessment
Final Essential Fish Habitat Report
|
Application
| Date of Application Submittal
| Completeness Determination
| Permits
| Statement of Basis
| Public Notice
| Other Supporting Information
|
Energy Transfer Partners Lone Star NGL Mont Belvieu Gas Plant
| Revised App June-5-2012
Response May-2012
| Complete
| Draft Permit (Aug 2012)
Final Permit (Oct 2012)
Final Permit Summary
| Statement of Basis
| Permit Notice
Public Notice
Proof of Publication
"No requests were received by September 27, 2012 for a public hearing, therefore, the previously planned public hearing for October 9, 2012 was cancelled."
Transmittal Letter
| Final Biological Assessment
Final Cultural Report
Addendum to Final Cultural Report
|
ExxonMobil Chemical, Baytown Olefins Plant
| App Received: May-22-2012
Response 10-16-12
Process Flow Diagram
Process Description
Response Addendum - Nov 2012
Response to EPA 01-31-2013
email &
Response to EPA 02-07-2013
Cracking Furnace
Duct Burner
Response to EPA 02-08-2013
Comment to EPA 05-03-2013
Comment to EPA 09-06-2013
Comment to EPA 09-20-2013
Comment to EPA 09-27-2013
Response to Comments
| Previous Incomplete
Complete
| Draft Permit (Jun 2013)
Public Comments Received
Final Permit (Nov 2013)
EPA Decision Letter (May 2014)
| Statement of Basis
| Public Notice
Transmittal Letter
"No requests were received by July 1, 2013 for a public hearing, therefore, the previously planned public hearing for July 17, 2013 was cancelled."
Final Public Notice
Final Transmittal Letter
| Final Cultural Report
Final Biological Assessment
Final Essential Fish Habitat Report
|
ExxonMobil Chemical, Mont Belvieu Plastics Plant
| App Received: May-22-2012
Response Nov-2012
Revised App: Mar-08-2013
Vent Gas Recovery Email 05/23/13
| Previous Incomplete
Complete
| Draft Permit (Jul 2013)
Final Permit (Sept 2013)
Final Permit Revisions Summary
| Statement of Basis
| Transmittal Letter
Public Notice
“No requests were received by August 12, 2013 for a public hearing, therefore, the previously planned public hearing for August 21, 2013 was cancelled.”
Signed Transmittal Letter
| Final Cultural Report
Final Biological Assessment
|
FGE Power, LLC
| App Received: May-6-2013
Response 01-17-14
Cost Est 03-09-14
| Previous Incomplete
| Draft Permit (Mar 2014)
Final Permit (Apr 2014)
Final Permit Revisions Summary
| Statement of Basis
| Public Notice
Transmittal Letter
“The permitting authority, having determined there was not a significant degree of interest in the draft permit, cancelled the public hearing previously scheduled for April 29, 2014.”
Final Transmittal Letter
| Draft Final Cultural Resources Report
Draft Final Cultural Resources Addendum
Draft Final Biological Assessment
|
Flint Hills Resources Corpus Christi, LLC, West Refinery
| App Received: Dec-18-2012
(See revised Mar 2014 App below)
Response May-16-2013
Response June-25-2013
Revised App: July-03-2013
EPA questions 06-18-13
Email Response 01-08-14
Request 01-30-14
Response 02-17-14
Request 02-05-14
Email Response 02-18-14
Response 02-21-14
Email Response on emitting units
Request on MSS activities
CCR Fuel 03-04-14
90 lbs Fuel 03-04-14
Response 03-04-14
Mid Plant Fuel 03-04-14
Purchase fuel 03-04-14
Email Response 03-04-14
Signed Settlement Agreement
Response on BACT Analysis 03-11-14
Email Response on BACT Analysis 03-11-14
Email Response 03-13-2014
Response on Emissions 03-13-2014
Response on BACT Analysis 03-17-2014
Email Response on BACT Analysis 03-18-2014
Email on calc revisions 03-19-14
Calc revisions 03-19-14
Revised App: Mar 2014
Request 03-12-14
Response 04-08-14
| Previous Incomplete
| Draft Permit (Apr 2014)
Final Permit (May 2014)
Final Permit Revision Summary (May 2014)
| Draft Statement of Basis
| Public Notice
Transmittal Letter
“No requests for a public hearing were received by April 30, 2014, therefore, the previously planned public hearing for May 21, 2014 was cancelled."
Final Transmittal Letter
| Final Essential Fish Habitat Report
Draft Final Biological Assessment
U.S. FWS Response
NOAA Concurrence
Final Cultural Report
SHPO Concurrence Response
Tribal Consultation Letter
|
Application
| Date of Application Submittal
| Completeness Determination
| Permits
| Statement of Basis
| Public Notice
| Other Supporting Information
|
Formosa Plastics Corporation, Texas, Low Density Polyethylene (LDPE) Plant
|
App Received: Dec-11-2012
Comments Received: May-10-2013
LDPE response July-01-2013
Emission calculation table A-1 Mar-2014
Emission calculation table A-1 Apr-2014
MSS Emission calculation table A-8 Apr-2014
Emission calculation check
| Previous Incomplete
| Draft Permit (Jun 2014)
Final Permit (Aug 2014)
Final Permit Revisions Summary (Aug 2014)
| Draft Statement of Basis
| Transmittal Letter
Public Notice
"The permitting authority, having determined there was not a significant interest in the draft permit, cancelled the public hearing previously scheduled for July 31, 2014."
Proof of Publication
Final Transmittal Letter
| Draft Final Cultural Report
|
Formosa Plastics Corporation, Texas, Olefins Expansion
| App Received: Dec-11-2012
Revised Olefins3 GHG Application May-16-2013
Revised Olefins3 GHG Application Section 6.3 Aug-09-2013
Detail PDH Reactor 08-09-13
Followup email 08-09-2013
Supplemental Responses 08-09-2013
Furnace Detail
Response to Flare as Backup
Response Mar-17-2014
Response Mar-24-2014
Response Apr-08-2014
Response to PDH Reactor Catalyst Apr-09-2014
Response Apr-09-2014
Response CCS Evaluation Apr-09-2014
EPA Response Apr-09-2014
Revised App C BACT Analysis Apr-09-2014
App C BACT Analysis Apr-14-2014
Site Specific CCS Evaluation Apr-14-2014
Table 6-8 CCS Costs
Revised calculation Mar-2014
Table A-1 Apr-2014
Table A-10 Apr-2014
Response to MSS totals Apr-28-2014
Table A-11 Apr-2014
Response to furnace question Apr-01-2014
Revised calculation May-2014
Emission calculation check
Expansion BACT Limits
Expansion Calculations
BACT Engines and MSS
| Previous Incomplete
| Draft Permit (Jun 2014)
Final Permit (Aug 2014)
Final Permit Revisions Summary (Aug 2014)
| Draft Statement of Basis
| Public Notice
Transmittal Letter
"The permitting authority, having determined there was not a significant interest in the draft permit, cancelled the public hearing previously scheduled for July 31, 2014."
Proof of Publication
Transmittal Letter
| Draft Final Cultural Report
|
Formosa Plastics Corporation, Texas, Gas Turbines
| App Received: Dec-11-2012
Comments Received: May-10-2013
Response Aug-09-2013
Emission Summary Table A-1 Mar-2014
Utility Calculations
Appendix C - CCS BACT Analysis
Short Ton Conversion
Table 6-8
Gas Turbine email 04-17-14
Capital Cost May-12-2014
Gas Turbines Calc email 06-04-14
Gas Turbines Conversion email
Gas Turbines Sum of Plant Costs
| Previous Incomplete
| Draft Permit (Jun 2014)
Final Permit (Aug 2014)
Final Permit Revisions Summary (Aug 2014)
| Draft Statement of Basis
| Public Notice
Transmittal Letter
"The permitting authority, having determined there was not a significant interest in the draft permit, cancelled the public hearing previously scheduled for July 31, 2014."
Proof of Publication
Final Transmittal Letter
| Draft Final Cultural Report
|
Application
| Date of Application Submittal
| Completeness Determination
| Permits
| Statement of Basis
| Public Notice
| Other Supporting Information
|
Golden Spread Electric Cooperative, Antelope Station
| App Received: Feb-1-2013
Revised App: July 29, 2013
Response to EPA Completion Determination
Basis for BACT Limits
| Previous Incomplete
| Draft Permit (Apr 2014)
Final Permit Cover Letter (June 2014)
Final Permit (June 2014)
| Statement of Basis
| Public Notice
Transmittal Letter
“No requests were received by May 21, 2014 for a public hearing, therefore, the previously planned public hearing for June 11, 2014 was cancelled.”
| Draft Final Cultural Report
Final Biological Assessment
Addendum to Final Biological Assessment
|
Guadalupe Power Partners LP
| App Received: Nov-13-2012
Response: Jun-12-2013
Revised App: Sept 10, 2014
Revised table Oct 6, 2014
| Previous Incomplete
| Draft Permit (Oct 2014)
Final Permit (Dec 2014)
Final Permit Revisions Summary (Dec 2014)
| Statement of Basis
| Public Notice
Transmittal Letter
"No requests were received by November 14, 2014, for a public hearing, therefore, the previously scheduled public hearing for December 2, 2014 has been cancelled."
Final Transmittal Letter
| Final Cultural Report
Draft Final Biological Assessment
|
Indeck Wharton Energy Center
| App Received: June-21-2013
Response: Feb-03-2014
Revised Appendix B
Response to EPA 01-08-2014
SHPO Concurrence
|  | Draft Permit (Apr 2014)
Final Permit (May 2014)
Final Permit Revisions Summary
| Statement of Basis
| Transmittal Letter
Public Notice
"The permitting authority, having determined there was not a significant degree of interest in the draft permit, cancelled the public hearing previously scheduled for May 12, 2014.”
Final Transmittal Letter
| Draft Final Cultural Report
Final Biological Assessment
|
INEOS USA LLC, No. 2 Olefins Unit
Brazoria County, Tx
| App Received:
Jul-28-2011
Revised App: Feb-24-2012, updated May 2012
Request for CBI
Return of CBI
| Previous Incomplete
Re-posted 12-04-2013
| Draft Permit (Aug 2012)
Final Permit (Oct 2012)
Final Permit Cover Letter
| Statement of Basis
Supplement to Statement of Basis
| Public Notice
Notification Letter
"No requests were received by Sept 24, 2012 for a public hearing, therefore, the previously planned public hearing for Oct 2, 2012 was cancelled."
| Final Essential Fish Habitat Report
Final Biological Assessment
Final Cultural Report
Additional information
SHPO Concurrence Response
|
Invenergy Thermal Development LLC
Ector County Energy Center
| App Received: May-13-2013
Revised App: Jun-26-2013
Request for Info
Emission Summary 12-31-13
Response 01-02-14
Supplemental Info 03-24-14
|  | Draft Permit (Apr 2014)
Cover Letter
Final Permit (Aug 2014)
Final Permit Revisions Summary (Aug 2014)
| Statement of Basis
| Public Notice
“No requests for a public hearing were received by May 8, 2014, therefore, the previously planned public hearing for May 27, 2014 was cancelled.”
Transmittal Letter
| Draft Final Cultural Report
Draft Final Biological Assessment
|
INVISTA, S.a r.l., Victoria Site
| App Received: Mar-13-2012
Response Received: 07-18-2012
Supplemental App Material: 03-14-2013 (revised)
| Previous Incomplete
| Draft Permit (Mar 2013)
Final Permit (May 2013)
Signed MOA
| Statement of Basis
Supplement to the Statement of Basis
| Public Notice
“No requests were received by April 9, 2013 for a public hearing, therefore, the previously planned public hearing was cancelled."
Transmittal Letter
| Final Cultural Report
Addendum to Final Cultural Report
Final Biological Assessment
Yselta del Sur Pueblo Response
Tonkawa Tribe Response
United Keetoowah Band of CherokeeResponse
|
Application
| Date of Application Submittal
| Completeness Determination
| Permits
| Statement of Basis
| Public Notice
| Other Supporting Information
|
KM Liquids Terminals
| App Received: Mar-27-2012
Revised App: Jul-26-2012
3) Revised App: 01-18-2013
Revised App: 03-05-2013
| Previous Incomplete
| Draft Permit (Apr 2013)
Final Permit (May 2013)
Permit Revisions Summary
| Statement of Basis
| Public Notice
Transmittal Letter
“No requests were received by May 1, 2013 for a public hearing, therefore, the previously planned public hearing for May 14, 2013 was cancelled.”
Final Transmittal Letter
| Final Cultural Report
Additional Info
Final Biological Assessment
Final Essential Fish Habitat Report
|
La Paloma Energy Center
| Revised App: July 2012
Response letter Aug-06-2012
Application Addendum: Aug-06-2012
Response to Questions: Nov-1-2012
Revised App: Mar-03-2013
Response email Feb-08-2013
Response letter Aug-08-2013
Wastewater provider Jan-30-2013
Econamine Technology Info Aug-05-2013
| Complete
Final Complete
| Draft Permit (Mar 2013)
Public Comments Received
Edited Appendix A from Sierra Club. Contact
wilson.aimee@epa.gov for a full copy.
Response to Public Comments Nov-06-2013
Final Permit (Nov 2013)
| Statement of Basis
| Public Notice
Signed Transmittal Letter
"No requests were received by April 15, 2013 for a public hearing, therefore, the previously planned public hearing for May 1, 2013 was cancelled."
Transmittal Letter: Nov-06-2013
Public Notice
Final Transmittal Letter
| Final Cultural Report
Final Biological Assessment
|
LCRA Thomas Ferguson GHG PSD
| App Received:
Mar-15-2011
| Complete
| Draft Permit (Sept 2011)
Final Permit (Nov 2011)
Revision Summary
| Statement of Basis
| Final Permit Announcement
Permit Public Notice
Final Transmittal Letter
| EJ Analysis
Final Cultural Report
Final Biological Assessment
|
Application
| Date of Application Submittal
| Completeness Determination
| Permits
| Statement of Basis
| Public Notice
| Other Supporting Information
|
Lon C. Hill Power Station
| App Received: Nov-8-2013
NOD Resp Letter
Air Quality Analysis
Attachments
Revised App 02-28-14
Resp to question 4
email 03-19-14
Emissions
Heat Rate w/ degradation
Siemens Performance
email 03-25-14
Siemens Annual Rates
BACT Cost Analysis
Combined Cycle Units
Combined Cycle Unit Performance
email 03-28-14
Revised App 05-13-14
Updated Calcs
BACT 08-13-14
CCS Cost 08-13-14
email resp 08-13-14
BACT 08-18-14
Fact Sheet 10-27-14
|  | Draft Permit (Sept 2014)
Final Permit (Oct 2014)
Revision Summary
| Statement of Basis
| Public Notice
Draft Transmittal Letter
"No requests were received by October 10, for a public hearing, therefore, the previously scheduled public hearing for October 28, 2014 has been cancelled.”
Final Transmittal Letter
| Draft Final Cultural Report
Draft Biological Assessment
SHPO Concurrence Response
|
Lone Star NGL Mont Belvieu Gas Plant
FRAC III Plant
(Also see Energy Transfer Partners - above)
| App Received: Jun-7-2013
Revised App
|  | Draft Permit (Feb 2014)
Final Permit (Apr 2014)
Revision Summary
| Statement of Basis
| Public Notice
Transmittal Letter
"The permitting authority, having determined there was not a significant degree of interest in the draft permit, cancelled the public hearing previously scheduled for April 16, 2014.”
Final Transmittal Letter
| Final Cultural Report (same as ETP Mont Belvieu - above)
Final Cultural Report: Supp. 1,
Supp. 2,
Supp. 3
Letter to the EPA addressing FRAC III APE and AA
Final Biological Assessment
SHPO Concurrence
|
Magellan Terminal Holdings, LP
| App Received: Nov-13-2013
Resp to EPA 03-19-14
Revised Page 4-2
Revised App 08-22-14
Revised App 09-22-14
Additional Supporting Info
|  | Draft Permit (Oct 2014)
Final Permit (Dec 2014)
Revision Summary
| Statement of Basis
| Transmittal Letter
Public Notice
“No requests were received by November 18, 2014 for a public hearing, therefore, the previously planned public hearing for December 4, 2014 was cancelled.”
Final Transmittal Letter
Public Notice
| Draft Final Cultural Resources Report
Draft Biological Assessment
|
M&G Resins USA, LLC. PET Plant
(Part of Project Jumbo)
| App Received: Mar-4-2013
App Updates: May-to-Sept-2014
| Incomplete (Feb 2014)
Def Response (Mar 2014)
| Draft Permit (Oct 2014)
Final Permit (Nov 2014)
Revision Summary
| Statement of Basis
| Public Notice
"The permitting authority, having determined there was not a significant degree of interest in the draft permit, cancelled the public hearing previously scheduled for November 17, 2014."
Final Transmittal Letter
| Final Cultural Report
Final Biological Assessment
TCEQ non GHG PSD App - Feb 2013
|
M&G Resins USA, LLC. Utility Plant (Part of Project Jumbo; formerly NRG Development, Corpus Christi Combine Heat and Power)
| App Received: Mar-27-2013
M&G Util Pmt App Updates
Util App Upd May15 2014
| Incomplete (Feb 2014)
Util App Upd May15 2014
| Draft Permit (Oct 2014)
Final Permit (Nov 2014)
Revision Summary
| Statement of Basis
| Public Notice
"The permitting authority, having determined there was not a significant degree of interest in the draft permit, cancelled the public hearing previously scheduled for November 17, 2014."
Final Transmittal Letter
| Final Cultural Report
Final Biological Assessment
TCEQ non GHG PSD App -May 2014
|
Natgasoline, LLC
| App Received:
Feb 19-2013
Revised App:
Nov 06-2013
Response to Incomplete Determination
Updated CCS Costs 06-27-14
Additional Information 08-01-14
| Previous Incomplete
| Draft Permit (Aug 2014)
Final Permit (Sept 2014)
| Statement of Basis
Basis of Decision
| Draft Public Notice
Transmittal Letter
"No requests were received by September 17, 2014, for a public hearing, therefore, the previously scheduled public hearing for October 8, 2014 has been cancelled"
Final Transmittal Letter
| Draft Biological Assessment
Draft Final Cultural Resources Report
|
Nuevo Midstream, LLC Ramsey Gas Plant
| App Received:
Jan-27-2014
Updated Engine Calcs 05-21-14
Additional Info 08-27-14
Revised App:
Aug 2014
EOR Cost 09-04-14
Injection Wells
Estimated Number of Wells
Sequestration Costs
|  | Draft Permit (Oct 2014)
Final Permit (Nov 2014)
Revision Summary
| Statement of Basis
| Transmittal Letter
Draft Public Notice
"No requests were received by November 4, 2014, for a public hearing, therefore, the previously scheduled public hearing for November 19, 2014 has been cancelled."
Final Transmittal Letter
| Draft Final Cultural Report
Draft Final Biological Assessment
|
Application
| Date of Application Submittal
| Completeness Determination
| Permits
| Statement of Basis
| Public Notice
| Other Supporting Information
|
Occidental Chem Corp
Ingleside Chemical Plant,
Ethylene Plant
| App Received: Dec-28-2012
Furnance Efficiency Calc
Avg Cost Effectiveness
Revised App - Nov 2013
Revised App - Jan 2014
Cost Est 02-03-14
Citizen Comment 04-24-14
Letter 05-23-14
Programmatic Agreement 05-23-14
Response to Comments 05-23-14
| Previous Incomplete (July 2013)
Response to EPA Completeness
| Draft Permit (Mar 2014)
Final Permit (May 2014)
| Statement of Basis
| Public Notice
Transmittal Letter
“The permitting authority, having determined there was not a significant degree of interest in the draft permit, cancelled the public hearing previously scheduled for May 8, 2014.”
| Cultural Report Site Facility: Supplemental Info (No Effects)
Final Cultural Report
Final Cultural Report: Pipeline Expansion
Draft Final Biological Assessment
Biological Assessment: Appendices A,
B,
C,
D
|
Occidental Chem Corp,
Natural Gas Fractionation Facilities,
Ingleside Chemical Plant
| App Received: May-21-2012
Response: Aug-01-2012
| Previous Incomplete
Complete
| Draft Permit (Jul 2013)
Final Permit (Jan 2014)
Permit Revision Summary
Corrected Final Permit
(Apr 2014)
Strikeout Emission Table
| Statement of Basis
| Public Notice
Transmittal Letter
“No requests were received by August 5, 2013 for a public hearing, therefore, the previously planned public hearing for August 21, 2013 was cancelled.”
Final Transmittal Letter
Revised Final Transmittal Letter
| Total Capital Cost email
Final Cultural Report: Site
Final Essential Fish Habitat Report
Final Biological Assessment
USFWS Concurrence Response
NOAA Concurrence Response
Oxy Chem Commitment Letter to NOAA 01-14-14
OxyChem SHPO Response 9-5-13
OxyChem SHPO Final Report
|
OCI Beaumont LLC
| App Received: Dec-21-2012
Equipment Diagram
Response 12-12-2013
Reply to emails
Emit Calcs 03-19-14
Response 03-06-14
PTE Calculations v2
| Previous Incomplete
| Draft Permit (Jun 2014)
Draft Permit Cover Letter
Final Permit (Aug 2014)
Final Permit Basis of Decision
| Statement of Basis
| Public Notice
“No requests were received by July 14, 2014 for a public hearing, therefore, the previously planned public hearing on July 28, 2014 has been cancelled”.
| Draft Final Cultural Report
Draft Final Biological Assessment
|
Application
| Date of Application Submittal
| Completeness Determination
| Permits
| Statement of Basis
| Public Notice
| Other Supporting Information
|
ONEOK Hydrocarbon, Mont Belvieu NGL Fractionation Plant
| App Received: Sept-21-2012
Response: Jan-14-2013
Revised App: 04-29-2013
Revised App: 05-08-2013
Cooling Tower BACT Info
Questions from EPA
| Previous Incomplete
| Draft Permit (May 2013)
Permit revision summary
Final Permit (Jul 2013)
| Statement of Basis
| Transmittal Letter
Public Notice
“No requests for a public hearing were received as of June 24, 2013, therefore the previously planned public hearing for July 10, 2013 was cancelled.”
Final Transmittal Letter
| Final Cultural Report
Final Biological Assessment
|
ONEOK Hydrocarbon, Mont Belvieu NGL Fractionation Plant, Frac-3 and Frac-4
| App Received: Jan-28-2014
Response 02-24-14
Response 04-04-14
|  | Draft Permit (May 2014)
Final Permit (Jun 2014)
Summary of Revisions
| Statement of Basis
| Transmittal Letter
Public Notice
"The permitting authority, having determined there was not a significant degree of interest in the draft permit, cancelled the public hearing previously scheduled for June 25, 2014"
Final Transmittal Letter
| Draft Cultural Report
Biological Assessment
|
Pinecrest Energy Center, LLC
| App Received: Feb-28-2013
Revised App: May-01-2014
email response May-14-2014
|  | Draft Permit (Jun 2014)
Final Permit (Aug 01, 2014)
Summary of Revisions (Aug 01, 2014)
| Statement of Basis
| Transmittal Letter
Public Notice
"The permitting authority, having determined there was not a significant degree of interest in the draft permit, cancelled the public hearing previously scheduled for July 30, 2014.”
Final Transmittal Letter
| Draft Final Cultural Report
Draft Final Cultural Resources Report – Linear Facilities Addendum.
Draft Biological Assessment.
|
PL Propylene LLC
| Revised App: 2013
Summary of Revisions
| Previous Incomplete
Complete
| Draft Permit (Apr 2013)
Final Permit (Jun 2013) | Statement of Basis
| Public Notice
Transmittal Letter
“No requests were received by May 13, 2013 for a public hearing, therefore, the previously planned public hearing for May 22, 2013 was cancelled”.
Final Transmittal Letter
| Final Cultural Report
Final Biological Assessment
Final Essential Fish Habitat Report
|
Rohm and Haas
Deer Park Chemical Plant
Harris county, Tx
| App Received: Oct-26-2012
Incompleteness response 02-04-2013
Supplemental Info
| Previous Incomplete
| Draft Permit (Dec 2013)
Final Permit (Feb 2014)
Summary of Revisions
| Statement of Basis
| Public Notice
Transmittal Letter
Proof of Public Notice
“No requests were received by January 21, 2014 for a public hearing, therefore, the previously planned public hearing was cancelled."
Final Transmittal Letter
| Draft Final Cultural Report
Final Essential Fish Habitat Report
Final Biological Assessment
|
Application
| Date of Application Submittal
| Completeness Determination
| Permits
| Statement of Basis
| Public Notice
| Other Supporting Information
|
South Texas Electric Cooperative Red Gate Power Plant
| App Received: Jan-02-2013
Response: June-07-2013
Response: July-31-2014
Sierra Club Comments Oct-03-2014
Response to Sierra Club Comments, 11-14-2014
email response 01-28-15
email response 01-30-15
email response 02-10-15
Wartsila brochure
| Incomplete
| Draft Permit (Sept 2014)
Final Permit (Feb 2015)
| Statement of Basis
| Public Notice
Transmittal Letter
Proof of Public Notice
“No requests were received by October 7, 2014, for a public hearing, therefore, the public hearing previously scheduled for October 28, 2014, was cancelled.”
Final Transmittal Letter
Response to Public Comments
| Draft Final Cultural Resource Report
Draft Final Cultural Resource Report Addendum
Draft Final Biological Assessment
|
Targa Gas Processing, Longhorn Gas Plant
| App Received: Feb-23-2012
Revised Emission Data
Process Description
Summary of Revisions - 06-18-2013
| Previous Incomplete
Complete
| Response: Aug-13-2012
Response letter 12-20-2012
Draft Permit (Apr 2013)
Final Permit Cover Letter
Final Permit (Jun 2013)
| Statement of Basis
| Public Notice
Transmittal Letter
Proof of Public Notice
“No requests were received by April 26, 2013 for a public hearing, therefore, the previously planned public hearing for May 15, 2013 was cancelled."
| Final Cultural Report
Final Biological Assessment
|
Targa Midstream Services, Mont Belvieu Plant
| App Received: Mar-26-2012
Response: Nov-08-2012
Emission Rate Data
Train 5 email revisions
Train 5 Emission Rates
| Previous Incomplete
| Draft Permit (Nov 2013)
Final Permit (Dec 2013)
Final Permit Revisions Summary (Dec 2013)
| Statement of Basis
| Transmittal Letter
Public Notice
“No requests were received by December 16, 2013 for a public hearing, therefore, the previously planned public hearing for January 8, 2014 was cancelled.”
Transmittal Letter Dec-30-2013
| Final Draft Cultural Resources Report
Final Biological Assessment
|
Tenaska Brownsville Generating Station
Brownsville, Texas
| App Received: Feb-15-2013
Resp to Deter Letter 12-16-13
Revised App: Mar-20-2014
Emission Data 04-10-14
Cost Est from Trinity 05-19-14
Revised Emission Data 09-10-14
Response to Comments on the CR: Part 1
Response to Comments on the CR: Part 2
Response to Comments on the CR: Part 3
| Incomplete
| Draft Permit (Oct 2014)
Final Permit (Jan 2015)
Final Permit Revisions Summary (Dec 2013)
| Statement of Basis
| Transmittal Letter
Public Notice
"No requests were received by November 19, 2014 for a public hearing, therefore, the previously planned public hearing for December 3, 2014 was cancelled"
Public Notice
Final Transmittal Letter
| Final Biological Assessment
BA Addendum 1
BA Addendum 2
Cultural Resources Assessment (CRA)
CRA: Appendices A, B, C, Attachment 1
CRA: Attachment 2
CRA: Attachment 3 and 4
EPA NHPA Determination
NHPA Proposed MOA
Signed MOA
|
Tenaska Roans Prairie Generating Station
| App Received: July-22-2013
EPA Resp Jan-14-2014
EPA Resp Jan-21-2014
Revised App: Mar-05-2014
Revised App: Apr-28-2014
Annual avg BACT Limits 05-12-14
Avg BACT Limits 05-14-14
|  | Draft Permit (May 2014)
Final Permit (Aug 2014)
Final Permit Revisions Summary (Aug 2014)
| Statement of Basis
| Public Notice
Transmittal Letter
“No requests were received by Monday June 16, 2014 for a public hearing, therefore, the previously scheduled public hearing for July 16, 2014 was cancelled.”
Final Transmittal Letter
Public Notice
| Draft Final Cultural Report
Draft Final Biological Assessment
|
Victoria Power Station
| App Received: Feb 15, 2013
email to EPA 05-14-14
email to EPA 07-07-14
emission rate calcs
Performance Stds
Proposed Stds
email to EPA 07-28-14
Response to Comments 10-3-14
| Previous Incomplete
| Draft Permit (Aug 2014)
Final Permit (Oct 2014)
| Statement of Basis
| Transmittal Letter
Public Notice
Proof of Publication
“No requests were received by Wednesday September 3, 2014 for a public hearing, therefore, the previously scheduled public hearing for September 24, 2014 was cancelled.”
Final Transmittal Letter
Public Notice
| Draft Final Cultural Report
Draft Final Biological Assessment
|
Voestalpine
| App Received: Feb-04-2013
Resp to Incomplete Determination 11-0-13
Revised App 11-26-13
Emission Calcs 01-23-14
Tech Comparison 04-08-14
Response 04-20-14
Flow Diagrams
| Previous Incomplete
| Draft Permit (Apr 2014)
Final Permit (Jun 2014)
| Statement of Basis
Basis of Decision
| Public Notice
Transmittal Letter
“No requests were received by Friday May 16, 2014 for a public hearing, therefore, the previously scheduled public hearing for June 11, 2014 was cancelled.”
Final Transmittal Letter
| Draft Final Biological Assessment
Biological Assessment: Addendum
Essential Fish Habitat
Draft Final Cultural Report
NOAA Concurrence
USFW Concurrence
SHPO Concurrence
|