Jump to main content.


Corrosion Control Letter - 04/15/04

DEPARTMENT OF THE ARMY
WASHINGTON AQUEDUCT
U.S. ARMY CORPS OF ENGINEERS, BALTIMORE DISTRICT
5900 MACARTHUR BOULEVARD, N. W.
WASHINGTON, D.C. 20016-2514

April 15, 2004


Mr. Jon M. Capacasa, Director
Water Protection Division
U.S. Environmental Protection Agency, Region III
1650 Arch Street
Philadelphia, PA 19103-2029

Dear Mr. Capacasa:

          The purposes of this letter are to submit to EPA our final Desktop Corrosion Control Study prepared by CH2MHi11 on behalf of the Washington Aqueduct as outlined in the Action Plan to Reduce the Occurrence of Lead Leaching from Service Lines, Solder or Fixtures into Tap Water in the District of Columbia, Arlington County and Falls Church, Virginia and to request EPA approval of re-optimized Optimal Corrosion Control Treatment (OCCT.) Proposed OCCT is described in section 5 and section 6 of the enclosed study to include:


           Washington Aqueduct is a wholesaler of water. It has no distribution system of own. Thus, any treatment, including OCCT, applied by the Washington Aqueduct will affect its customer's water systems. The Public Water Systems (PWS's) affected are:

PWS Identification Number Public Water System
D00000001 Washington Aqueduct Division,
U.S. Army Corps of Engineers
D00000002

District of Columbia Water
and Sewer Authority (DC WASA)

VA6013010 Arlington County Public Works
VA6013080 Washington National Airport
VA6610100 City of Falls Church Public Utilities

          We propose that interim Optimum Water Quality Parameters (OWQPs) for entry points to the distribution system be set for two phases with final OWQP's being set upon completion of pipe loop studies, and within one year of interim approval of OCCT. We propose that interim OWQP's be set as the following:

          We intend to conduct a study to optimize pH control and suggest that the pH requirements be reviewed and tightened after the recommendations of the study are implemented.

          Thank you for your work with us on the important issue of corrosion control. If your staff has questions or requires any further discussion regarding these issues, please have them contact Mr. Lloyd D. Stowe at (202) 764-2702.


Sincerely,

(Signed)

Thomas P. Jacobus
General Manager

//



cc:

Mr. Jerry N Johnson, D.C. WASA

Mr. Robert Etris, City of Falls Church, VA Mr. Dave Hundelt, Arlington County, VA

 

 


Local Navigation


Jump to main content.