Jump to main content.


Region 5 Case Studies

These are Superfund Sites in Region 5 where Ecological Technical Center ecologists have had a role in developing the ecological risk assessment study. They may or may not fit directly into the 8-Step Ecological Risk Assessment Guidance. Please note that the site descriptions, especially concerning contaminants present at the site, may not represent the current situation. This is particularly the case if remedial or removal actions have taken place since the Ecological Risk Assessment (ERA) was performed. These case-studies are provided to give examples of how these sites were evaluated for ecological risk.
 

Site Name Location Date*
Information Available on these Sites
These sites have the entire risk assessment presented in html on this web site. Date is when the Ecological Risk Assessment was submitted by the risk assessor to the EPA project manager.
Camp Perry Landfill Clinton, Ohio September 1995
Cosden Oil and Chemical Co. Calumet City, Illinois October 1996
Cottage Grove Landfill Chicago, Illinois August 1995
Elliot Ditch/Wea Creek Lafayette, Indiana July 2001
House's Junkyard Gary, Indiana December 1994
Johnson Iron Industries Charlotte, Michigan January 1995
Kohnen and Lammers Chemical Co. Site Valleywood Subdivision, Beavercreek, Ohio September 1995
Land and Lakes No. 2 Landfill Chicago, Illinois July 1995
Pullman Factory Chicago, Illinois September 1995
These sites have summaries and the current status presented here, along with a pdf of the entire risk assessment. Date is when the ERA was finalized.
Allied Paper, Inc. / Portage Creek / Kalamazoo River Superfund Site Michigan April 2003
Bennett's Dump Site Bloomington, Indiana November 2005
Kerr-McGee and Kress Creek Site West Chicago, Illinois May 2004
Lemon Lane Landfill Bloomington, Indiana December 2005
Manistique Harbor & River Site Manistique, Michigan March 2005
Other Applications of Ecological Risk Assessments
Ecologically-based Clean-up Goals

Local Navigation


Jump to main content.