Slide taken from AEP Presentation Electric Power 2005
lADDITIONAL BENEFITS
lInlet and Outlet grid set up in ~1 hour with two individuals
lComplete inlet and outlet grid data collection requires about 15 minutes
lData analysis in ~ 15 minutes
lNo disruption of NH3 flow for inlet grid testing
lAbility to correct for unit and NH3 delivery fluctuations
lIndividual analyzer differences reconciled with “relative accuracy” check
lVery consistent results