20
Assist applied to downstream T-Rs by SMPS
Average KW of T-R 1-2 Before SMPS on Inlet 11.19
Average KW of T-R 1-2 with SMPS on Inlet             14.38
Increase / Decrease (%) 28%
Average KW of T-R 1-3 Before SMPS on Inlet 17.91
Average KW of T-R 1-3 with SMPS on Inlet                    20.34
Increase / Decrease (%) 14%
Average KW of T-R 1-4 Before SMPS on Inlet 23.38
Average KW of T-R 1-4 with SMPS on Inlet                     24.96
Increase / Decrease (%) 7%
Results of Phase 2