Sheldon Unit 1 (1963) -
120 MWg
Sheldon Unit 2 (1968) -
135 MWg
•Two units, each B&W boiler w/ 3-cyclones. Not Pulverized coal but
ground- coarse like rock salt
•Hot-side precipitators added 1976.
•Pulse jet baghouses added 2000- really low Opacity.
•No scrubbers or SCR
•PRB Coal for fuel, but not originally designed for
PRB
•Precipitators de-energized but still in gas stream to capture large ash
particles.
•Unit 1 Burner Fronts have been modified to Pre-Heat the coal before entry,
not Unit 2.
•