lYearly operating costs of > $750,000
l (or greater
then 30 MMBTU)
–Practical fuel cost savings of 5-10% criteria
•hardware cost with installation to be greater then
$75,000 (continuous NOx/ CO/O2 monitoring for 40CFR60 Appendix
B, PS-3 &PS-4 with compliance DAS
reporting)
–Predictive Emissions Monitoring Systems (PEMS);
continuous real-time software
monitoring system
•use USEPA 40CFR60 Continuous Emissions Monitoring as guidance
–Practical payback target is one (1) year
l