lYearly operating costs of < $750,000
l (or less then
30 MMBTU)
–practical fuel cost savings of 5-10% criteria
•hardware cost with installation to be at $75,000
maximum (continuous NOx/ CO/O2 monitoring for 40CFR60 Appendix B, PS-3 &PS-4 with
recorder/data-logger)
–Predictive Emissions Monitoring Systems (PEMS);
continuous real-time
•software monitoring system
•use USEPA 40CFR60 Continuous Emissions Monitoring as guidance
–Practical payback target is one (1) year
l