lYearly operating costs of < $750,000
l     (or less then 30 MMBTU)                           
–practical fuel cost savings of 5-10% criteria
•hardware cost with installation to be at $75,000 maximum   (continuous NOx/ CO/O2 monitoring for 40CFR60 Appendix B, PS-3 &PS-4 with  recorder/data-logger)
–Predictive Emissions Monitoring Systems (PEMS); continuous real-time
•software monitoring system
•use USEPA 40CFR60 Continuous Emissions Monitoring as guidance
–Practical payback target is one (1) year
l
Draft Monitoring Guidance