l
Yearly operating costs of
<
$250,000
l
(or less then 10 MMBTU)
–
Practical fuel cost savings of 5-10% criteria hardware cost
to be at $25,000 maximum (Portables)
•
use CAM as guidance for monitoring
–
Practical payback target is one (1) year
l
l
Draft Monitoring Guidance