lYearly operating costs of < $250,000
l    (or less then 10 MMBTU)
–Practical fuel cost savings of 5-10% criteria hardware cost to be at $25,000 maximum (Portables)
•use CAM as guidance for monitoring
–Practical payback target is one (1) year
l 
l
Draft Monitoring Guidance